Underground CoC (MD)

Project Description:      Underground Electric Distribution Contractor of Choice

Project Location:           Maryland

Project Schedule:          July 2014 through June 2017

Role of Riggs Distler:    Riggs Distler’s role as a Contractor of Choice of blanket contract unit price work includes the supply of 25+ crews performing various underground electrical construction scopes of work.  Specific major scopes of work includes primary and secondary cable replacement via horizontal directional drilling (200,000+ feet of cable replaced annually), street light cable fault locating and repairing (approximately 5,000 annually), and outdoor lighting construction (cabling and poles/fixtures, plus LED conversions).