Flare Gas Recovery (PA)

Project Description:      Flare Gas Recovery Project

Project Location:           Pennsylvania  

Project Schedule:           July 2015 to December 2015  

Role of Riggs Distler:    Riggs Distler was awarded this project by way of competitive bid. Our scope of work included:

  • Installation of (#2) 25’ x 35’ compressor skids weighing 85,000 lbs each along with associated epoxy grouting and precision level and alignments.
  • Installation of (#4) Cooling Fin Fans weighing 65,000 lbs each.
  • Installation of an Electrical Building 14’ x 60’ weighing 80,000 lbs
  • Installation of 7,000 feet of small and large bore piping.
  • Installation of miscellaneous Pumps, Motors, Pipe Racks, Vessels and Drums.