Utilty Road Project (MA)

Project Description:       Utility Road Project

Project Location:            Massachusetts

Project Schedule:           January 2016 – April 2017

Role of Riggs Distler:    Construct a Utility Grade Road for permanent access to 115kv I135/J136 Load Break Switch in Winchendon, MA.  There was no suitable vehicular access at the start of project.  The new road shall withstand movement of heavy equipment and snow plowing during winter storms.  New gravel road approximately 6,600’.  Road consisted of 12” gravel base, construction of a coffer dam (dewatering) over pond for road improvement, wetland restoration, and replication.