Fractionator BOP (PA)

Project Description:       Fractionator Balance of Plant Piping and Equipment Installation    

Project Location:            Pennsylvania    

Project Schedule:           July 2016 to March 2017

Role of Riggs Distler:    Our role consisted of the installation of 1500 feet of pipe rack with 17,000 feet of large and small bore piping with final tie-ins to existing spheres. Equipment setting consisted of the installation of (#3) Metering Skids, (#6) Vertical Pumps, (#1) Analyzer Building, (#1) PDC Building and Transformers.