Our Industries

Environmental Matting for Safe and Secure Work Areas

Over wetlands, through deep forests, and across steep slopes, utility and infrastructure projects often contend with rough, rugged terrain. Environmental matting ensures safe, stable work sites and access roads for work crews, while also protecting local habitats and wildlife from damage. Riggs Distler’s matting team specializes in taming tough landscapes for our clients so that their projects can proceed.

Protect your Project with Environmental Matting from Riggs Distler

Maintaining safe access and work areas for employees is a key concern for our clients, but environmental matting also helps to mitigate environmental concerns and compliance issues. Matting reduces a project’s environmental footprint by preventing contamination, spills, erosion, and other degradation that may require clean-up or restoration. Protecting against these factors, especially in sensitive natural areas, can result in significant time and cost savings on your project. 

Our environmental matting team designs site-specific solutions and mobilizes quickly to keep projects on schedule. With a massive inventory of matting and a fleet of delivery vehicles, we’re ready to roll whenever our clients need us. Riggs Distler offers:

  • Crane and Timber Mat Road Coverage
  • Laminate & Composite Matting
  • Road Building
  • Construction Entrance & Concrete Washout Instillation
  • Wetland Reclamation
  • E&S Control Installation & Maintenance
  • Permanent Restoration
  • Mat Cleaning
  • Stream Bank Protection
  • Fencing

Our Industries

Case Studies

15-Mile 69kV Transmission Line Rebuild—Southern New Jersey
2021
Riggs Distler was contracted to modernize and upgrade the performance of a major electric transmission line connecting two substations in southern...
COC for Overhead Transmission Projects—DE, PA, NJ, MD, IL
January 2021–December 2025
Riggs Distler is the Contractor of Choice for all installation, maintenance, and repair work performed on our client’s electrical transmission...
115kV Transmission Line Rebuild—New Hampshire
May–June 2020
Riggs Distler was contracted to upgrade aging tower infrastructure along an important 115kV electrical transmission line in New Hampshire. In order...
Great Egg Harbor Crossing Rebuild Project—New Jersey
September–December 2020
Riggs Distler was contracted to assemble and install eight electric transmission towers to provide improved electrical service to customers in...
Y138 Line Structure Replacements—New Hampshire
April–July 2020
Riggs Distler performed environmental matting and civil services in support of a project to upgrade aging and damaged support structures along...
Transmission Line Refurbishment Project Phase I — Massachusetts
Sept 2019–June 2020
Riggs Distler was contracted by a major power provider to provide environmental matting services in support of a 315 & 303/327/3520kV...
Access Matting for Structure Replacement – New Hampshire
April–June 2020
Riggs Distler’s environmental construction and matting teams provided civil services to improve access to an aging 115kV transmission line in New...
Environmental Services for Structure Replacement — New Hampshire
January–June 2020
Riggs Distler’s environmental matting team was contracted to build roads and provide extensive matting in support of a project to upgrade an aging...
Aquidneck Island Reliability Project — Rhode Island
April 2018–April 2019
Riggs Distler was contracted to provide Environmental Matting and Environmental Controls for the 61/62 Aquidneck Island Reliability Project, which...
J10 Soil Boring Access Project — Western Massachusetts
April–June 2018
Riggs Distler’s Environmental Matting Division was contracted to develop an access road across a difficult and inundated landscape to allow a test...