69 kV Greenfield Substation

Located in Camden, NJ

  • Capability
    • Electric Infrastructure
  • Completion 2016

Project Overview

In 2016, in Camden, NJ, we built a 69kV substation from the ground up, performing all related civil work and electrical installation. By handling all the necessary substation and heavy civil work in-house, we were able to realize cost savings for our client.

Key Highlights

Our crews tested and terminated all cable in the field and verified that all equipment was working as designed. In the control house, we installed and tested relays and other equipment that keep the station operating reliably, facilitate maintenance within the station, and allow for either remote or in-person switching. Our crews also installed four 80-foot steel structures to bring the 69 kV lines into the station.

Explore Project Details

Project Scope of Work Included:

  • Earth Work and Excavations
  • Installing Drilled Piers, Spread Footers, and Equipment Pads
  • Concrete Work
  • Installing Cable Trenches, the Station Ground Grid, and Secondary and Control Cable
  • Installing Circuit Breakers, Transformers, Bus Work, Junction Boxes, 69kv Switches, Lightning Masts, & Wire Jumpers

Challenges and Results

During the hot summer months this project was completed, safety was a concern. Our project leaders and Safety Supervisors conducted extensive on-site training for workers on mitigating hazards they faced in execution. We created traffic patterns so that vehicles could move safely in tight spaces and dedicated workers to guide drivers to their destinations. Our Safety team also ensured that workers had the proper personal protective equipment and instituted processes to ensure tools and equipment were in good working order. By mitigating safety concerns, we were able to ensure swift and efficient execution on an accelerated schedule.

As a result, we completed the substation build in four months using 30 direct craft workers and roughly 25,000 man-hours. Our team ultimately improved electrical service to businesses and residents throughout the client’s service territory, all without a single recordable injury.

Previous
Bird's eye view of a substation
Substation closeup
Holtec 4 (3)
Holtec 5
Holtec 3 (1)
Next
Previous Bird's eye view of a substation Substation closeup Holtec 4 (3) Holtec 5 Holtec 3 (1) Next
Previous 0 1 2 3 4 Next

Project Overview

In 2016, in Camden, NJ, we built a 69kV substation from the ground up, performing all related civil work and electrical installation. By handling all the necessary substation and heavy civil work in-house, we were able to realize cost savings for our client.

Key Highlights

Our crews tested and terminated all cable in the field and verified that all equipment was working as designed. In the control house, we installed and tested relays and other equipment that keep the station operating reliably, facilitate maintenance within the station, and allow for either remote or in-person switching. Our crews also installed four 80-foot steel structures to bring the 69 kV lines into the station.

Explore Project Details

Project Scope of Work Included:

  • Earth Work and Excavations
  • Installing Drilled Piers, Spread Footers, and Equipment Pads
  • Concrete Work
  • Installing Cable Trenches, the Station Ground Grid, and Secondary and Control Cable
  • Installing Circuit Breakers, Transformers, Bus Work, Junction Boxes, 69kv Switches, Lightning Masts, & Wire Jumpers

Challenges and Results

During the hot summer months this project was completed, safety was a concern. Our project leaders and Safety Supervisors conducted extensive on-site training for workers on mitigating hazards they faced in execution. We created traffic patterns so that vehicles could move safely in tight spaces and dedicated workers to guide drivers to their destinations. Our Safety team also ensured that workers had the proper personal protective equipment and instituted processes to ensure tools and equipment were in good working order. By mitigating safety concerns, we were able to ensure swift and efficient execution on an accelerated schedule.

As a result, we completed the substation build in four months using 30 direct craft workers and roughly 25,000 man-hours. Our team ultimately improved electrical service to businesses and residents throughout the client’s service territory, all without a single recordable injury.

Previous
Bird's eye view of a substation
Substation closeup
Holtec 4 (3)
Holtec 5
Holtec 3 (1)
Next
Previous Bird's eye view of a substation Substation closeup Holtec 4 (3) Holtec 5 Holtec 3 (1) Next
Previous 0 1 2 3 4 Next