COC for Overhead Transmission Projects

Located in DE, PA, NJ, MD, IL

  • Capability
    • Electric Infrastructure
  • Completion 2021-2025

Project Overview

From 2021 to 2025, we are the contractor of choice for all installation, maintenance, and repair work performed on our client’s electrical transmission system, a major East Coast power provider. Whether we’re upgrading equipment or repairing tower structures, our work improves reliability, sustains wind and weather damage, and delivers increased power to residents and businesses throughout the region.

Explore Project Details

Project Scope of Work Included:

  • Energized Services (69kv-765kv)
  • TOH Pole Setting and Installation of New Conductor and Static Wire (Including OPGW)
  • Reconductoring (Replacement Installation and Repair of Existing Conductor)
  • TOH Structure or Pole Replacements
  • TOH Structure Maintenance and Repair and Related Work
  • Tower Raising (Including Helicopter Operations)
  • Substation Interfacing (Civil and Electrical)
  • Foundation Installation (Dry or Wet Set), Including Rebar Cage and Anchor Bolt Cage Installation
  • Crane and Heavy Equipment Matting Installation and Removal
  • Hydro-Excavation for Potholing and Confirming Locates
  • Spoil Hauling and Removal
  • Access Matting, Grading, Erosion and Sediment Controls Installations
  • Material Handling and Verification
  • Hoisting and Setting Towers
  • Emergent Repairs (Including Storm Restoration)
  • Heavy Hauling (Construction Equipment, Towers, Transformers, Etc.)
  • Material Hauling and Staging
  • Constructability Reviews and Engineering Recommendations
  • Earthwork Grading (Including Material Export and Import)
  • Cellular Site Work on Transmission Poles or Towers

Challenges and Results

Accessibility is a key concern, as we routinely navigate challenging terrain—including wetlands, rivers, highways, mountains, and adverse weather—to get the job done. Working closely with our Environmental Matting Division, we stabilize work areas and build access roads to ensure safe operations and future site access. Compliance and permitting was another concern, especially when working across multiple states. We took proactive steps to minimize environmental impacts, protect sensitive habitats and archaeological sites, and coordinate with clients to plan around migration and mating seasons of protected species. Additionally, our capabilities include specialty services performed in-house such as “bare hand” energized line work and servicing cellular equipment on transmission structures.

Our work delivers redundancy in the power supply and a more capable and reliable electric grid for our client’s customers, without noticeably interrupting their service. With more than 900 trucks on the road every day, we respond to work assignments and mobilize for the field at lightning speed. As the client’s contractor of choice from 2011 to 2020, we were proud to have our contract renewed for another five-year term.

Previous
Stacks of matting platforms
Matting leading up to transmission tower
Next
Previous Stacks of matting platforms Matting leading up to transmission tower Next
Previous 0 1 Next

Project Overview

From 2021 to 2025, we are the contractor of choice for all installation, maintenance, and repair work performed on our client’s electrical transmission system, a major East Coast power provider. Whether we’re upgrading equipment or repairing tower structures, our work improves reliability, sustains wind and weather damage, and delivers increased power to residents and businesses throughout the region.

Explore Project Details

Project Scope of Work Included:

  • Energized Services (69kv-765kv)
  • TOH Pole Setting and Installation of New Conductor and Static Wire (Including OPGW)
  • Reconductoring (Replacement Installation and Repair of Existing Conductor)
  • TOH Structure or Pole Replacements
  • TOH Structure Maintenance and Repair and Related Work
  • Tower Raising (Including Helicopter Operations)
  • Substation Interfacing (Civil and Electrical)
  • Foundation Installation (Dry or Wet Set), Including Rebar Cage and Anchor Bolt Cage Installation
  • Crane and Heavy Equipment Matting Installation and Removal
  • Hydro-Excavation for Potholing and Confirming Locates
  • Spoil Hauling and Removal
  • Access Matting, Grading, Erosion and Sediment Controls Installations
  • Material Handling and Verification
  • Hoisting and Setting Towers
  • Emergent Repairs (Including Storm Restoration)
  • Heavy Hauling (Construction Equipment, Towers, Transformers, Etc.)
  • Material Hauling and Staging
  • Constructability Reviews and Engineering Recommendations
  • Earthwork Grading (Including Material Export and Import)
  • Cellular Site Work on Transmission Poles or Towers

Challenges and Results

Accessibility is a key concern, as we routinely navigate challenging terrain—including wetlands, rivers, highways, mountains, and adverse weather—to get the job done. Working closely with our Environmental Matting Division, we stabilize work areas and build access roads to ensure safe operations and future site access. Compliance and permitting was another concern, especially when working across multiple states. We took proactive steps to minimize environmental impacts, protect sensitive habitats and archaeological sites, and coordinate with clients to plan around migration and mating seasons of protected species. Additionally, our capabilities include specialty services performed in-house such as “bare hand” energized line work and servicing cellular equipment on transmission structures.

Our work delivers redundancy in the power supply and a more capable and reliable electric grid for our client’s customers, without noticeably interrupting their service. With more than 900 trucks on the road every day, we respond to work assignments and mobilize for the field at lightning speed. As the client’s contractor of choice from 2011 to 2020, we were proud to have our contract renewed for another five-year term.