Combined Cycle Power Generation Project

Located in New Jersey

  • Capability
    • Distributed Power, Renewable & Industrial
  • Completion 2014–2017

Project Overview

From 2014 to 2017, we installed over 35,000 feet of piping and over 100 pieces of equipment at a power plant in southern New Jersey. Our team handled most of the plant’s construction.

Explore Project Details

Project Scope of Work Included:

  • Critical and Noncritical Piping Systems (2–72 Inches)
  • Steam Turbine Generator, Auxiliary Boiler, Diesel Generator, and Stack Installations
  • Lubrication Oil Building Construction
  • Pump and Motor Set Installations
  • Vessels, Drum, and Exchanger Installations
  • Intensive Rigging Plans
  • Millwrighting

Challenges and Results

Work at the plant site involved 800 employees operating within a very tight footprint. Daily coordination and communication with contractors was a necessity to ensure collaboration and efficiency. During the project, we took on additional work, including high-energy piping installations and boiler construction that wasn’t in the original contract. Our team responded quickly to the out-of-scope work to keep our client’s completion dates on schedule with zero injuries.

As a result, our work ultimately delivered 751MW of combined cycle power to the client’s electric grid, enabling them to meet the growing demand for energy among South Jersey residents and businesses.

Previous
20190109 162405 (1)
60 Inch Fiber Glass Piping 1 (3)
Ccw Piping 3
Gen Stack Top Sect
Next
Previous 20190109 162405 (1) 60 Inch Fiber Glass Piping 1 (3) Ccw Piping 3 Gen Stack Top Sect Next
Previous 0 1 2 3 Next

Project Overview

From 2014 to 2017, we installed over 35,000 feet of piping and over 100 pieces of equipment at a power plant in southern New Jersey. Our team handled most of the plant’s construction.

Explore Project Details

Project Scope of Work Included:

  • Critical and Noncritical Piping Systems (2–72 Inches)
  • Steam Turbine Generator, Auxiliary Boiler, Diesel Generator, and Stack Installations
  • Lubrication Oil Building Construction
  • Pump and Motor Set Installations
  • Vessels, Drum, and Exchanger Installations
  • Intensive Rigging Plans
  • Millwrighting

Challenges and Results

Work at the plant site involved 800 employees operating within a very tight footprint. Daily coordination and communication with contractors was a necessity to ensure collaboration and efficiency. During the project, we took on additional work, including high-energy piping installations and boiler construction that wasn’t in the original contract. Our team responded quickly to the out-of-scope work to keep our client’s completion dates on schedule with zero injuries.

As a result, our work ultimately delivered 751MW of combined cycle power to the client’s electric grid, enabling them to meet the growing demand for energy among South Jersey residents and businesses.

Previous
20190109 162405 (1)
60 Inch Fiber Glass Piping 1 (3)
Ccw Piping 3
Gen Stack Top Sect
Next
Previous 20190109 162405 (1) 60 Inch Fiber Glass Piping 1 (3) Ccw Piping 3 Gen Stack Top Sect Next
Previous 0 1 2 3 Next