New Energy – Efficient Boilers For A State Prison
Located in Clinton, NJ
- Capability
- Distributed Power, Renewable & Industrial
- Completion 2019-2022
Project Overview
From 2019 to 2022, in Clinton, NJ, we were subcontracted to furnish and install high temperature hot water piping and steam piping for prepackaged Boilers in a Box (BIB) for 26 buildings at a Women’s Correctional Facility. Our main objectives for this project were to build a new energy-efficient boiler and upgrade the existing heating system.
Key Highlights
We implemented a plan to install hot water supply and return lines, low pressure steam and condensate lines, natural gas piping, and drain lines from the tie-in points at each building to the new BIB tie-ins. This installation enabled us to provide a reliable and efficient source of hot water, steam, natural gas, and drainage to each of the buildings.
Project Overview
From 2019 to 2022, in Clinton, NJ, we were subcontracted to furnish and install high temperature hot water piping and steam piping for prepackaged Boilers in a Box (BIB) for 26 buildings at a Women’s Correctional Facility. Our main objectives for this project were to build a new energy-efficient boiler and upgrade the existing heating system.
Key Highlights
We implemented a plan to install hot water supply and return lines, low pressure steam and condensate lines, natural gas piping, and drain lines from the tie-in points at each building to the new BIB tie-ins. This installation enabled us to provide a reliable and efficient source of hot water, steam, natural gas, and drainage to each of the buildings.